← Controls / MA

MA-02 Controlled Maintenance

Maintenance

Low Moderate High

Description

a. Schedule, document, and review records of maintenance, repair, and replacement on system components in accordance with manufacturer or vendor specifications and/or organizational requirements; b. Approve and monitor all maintenance activities, whether performed on site or remotely and whether the system or system components are serviced on site or removed to another location; c. Require that [Assignment: organization-defined personnel or roles] explicitly approve the removal of the system or system components from organizational facilities for off-site maintenance, repair, or replacement; d. Sanitize equipment to remove the following information from associated media prior to removal from organizational facilities for off-site maintenance, repair, or replacement: [Assignment: organization-defined information]; e. Check all potentially impacted controls to verify that the controls are still functioning properly following maintenance, repair, or replacement actions; and f. Include the following information in organizational maintenance records: [Assignment: organization-defined information].

Supplemental Guidance

Controlling system maintenance addresses the information security aspects of the system maintenance program and applies to all types of maintenance to system components conducted by local or nonlocal entities. Maintenance includes peripherals such as scanners, copiers, and printers. Information necessary for creating effective maintenance records includes the date and time of maintenance, a description of the maintenance performed, names of the individuals or group performing the maintenance, name of the escort, and system components or equipment that are removed or replaced. Organizations consider supply chain-related risks associated with replacement components for systems.

Changes from Rev 4

Control text adds ‘replacement’; control text expanded in several areas Adds a parameter for specifying information that must be sanitized from associated media prior to removal Discussion expanded with additional examples

Enhancements (1)

What NIST adds to this control. Select one to read its statement.

MA-02(02) Automated Maintenance Activities High

a. Schedule, conduct, and document maintenance, repair, and replacement actions for the system using [Assignment: organization-defined automated mechanisms]; and b. Produce up-to date, accurate, and complete records of all maintenance, repair, and replacement actions requested, scheduled, in process, and completed.

Withdrawn by NIST:

  • MA-02(01) Record Content, now in MA-02

Compliance Mappings

ISO 27001:2022

A.7.10A.7.13A.8.10

ISO 27002:2022

7.13

COBIT 2019

DSS01

NIST CSF 2.0

ID.AM-08PR.PS-03

ISO 42001:2023

A.6.2.6

ANSSI

Hygiene.34SecNumCloud.13.4

FINMA Circular 2023/1

IV.A(28)IV.A(29)IV.A(36)

OSFI B-13

B-13.2.3

EU GDPR

Art.32(1)(b)Art.32(1)(d)

EU DORA

Art.7(1)

BIO2

7.13

RBI CSF

Annex1.7ITGRCA.9

FISC Security Guidelines

FISC.F3FISC.O13

MLPS 2.0

8.1.10.2

DNB Good Practice

DNB.18.2

EU CRA

CRA.I.2c

CBE CSF

CTO-10

CBN CSF

Part3.3

POPIA

s19

IOSCO Cyber Resilience

PFMI-17

CPMI-IOSCO PFMI

PFMI.P17

HIPAA Security Rule

§164.310(a)(2)(iv)

ECB CROE

CROE.2.3.4

EBA ICT Guidelines

3.5(a)3.5(b)

SEBI CSCRF

PR.MA

BOT Cyber Resilience

Ch10.1

CMMC 2.0

MA

10 CFR 73.54

RG5.71-B-MA

PCI PTS v6

K

Solvency II

EIOPA-ICT-4.8

FCA SYSC 13

SYSC 13.7.2

HITRUST CSF v11

08.b

ISO 27799

11.2H.3

SEC Custody (Digital Assets)

SEC-CD-07

ISO 17799 (legacy)

9.2.4

COBIT 4.1 (legacy)

AI2.10