Bank of Thailand Notification สกช. 5/2566: Rules on the Oversight of IT Risk of Financial Institutions and Specialized Financial Institutions
The Bank of Thailand's rules on overseeing IT risk, binding on every financial institution and specialized financial institution in Thailand. Six attachments cover IT governance, IT security management, IT risk management, compliance with IT laws, IT audit and significant IT projects. The notification itself limits the disruption of mobile banking to 8 hours in a calendar year, and sets what institutions notify or report to BOT, a yearly self-assessment among them. BOT announced it on 16 October 2023, and it has been in force since 31 October 2023. OSA mapped it from BOT's Thai text with its own working translation, and keeps BOT's Thai titles beside OSA's English ones.
AC (7) AT (3) AU (7) CA (5) CM (9) CP (9) IA (3) IR (7) MA (3) MP (3) PE (11) PL (3) PM (12) PS (6) RA (5) SA (12) SC (7) SI (7) SR (5)
AC Access Control
AT Awareness and Training
AU Audit and Accountability
| Control | Name | BOT IT Risk Notification References |
|---|---|---|
| AU-01 | Policy and Procedures | A1.3 |
| AU-02 | Event Logging | A2.6 |
| AU-03 | Content of Audit Records | A2.6 |
| AU-06 | Audit Record Review, Analysis, and Reporting | A2.3A2.6 |
| AU-09 | Protection of Audit Information | A2.6 |
| AU-11 | Audit Record Retention | A2.6 |
| AU-12 | Audit Record Generation | A2.6 |
CA Security Assessment and Authorization
CM Configuration Management
| Control | Name | BOT IT Risk Notification References |
|---|---|---|
| CM-01 | Policy and Procedures | A1.3 |
| CM-02 | Baseline Configuration | A2.6 |
| CM-03 | Configuration Change Control | A2.6 |
| CM-04 | Impact Analyses | A2.6A2.7A6.1 |
| CM-05 | Access Restrictions for Change | A2.6 |
| CM-06 | Configuration Settings | A2.6A2.10 |
| CM-07 | Least Functionality | A2.6 |
| CM-08 | System Component Inventory | A2.1 |
| CM-12 | Information Location | A2.10 |
CP Contingency Planning
| Control | Name | BOT IT Risk Notification References |
|---|---|---|
| CP-01 | Policy and Procedures | A1.3 |
| CP-02 | Contingency Plan | A1.1A2.6A2.9A2.10S8 |
| CP-03 | Contingency Training | A2.9 |
| CP-04 | Contingency Plan Testing | A2.7A2.9 |
| CP-06 | Alternate Storage Site | A2.10 |
| CP-07 | Alternate Processing Site | A2.9S8 |
| CP-08 | Telecommunications Services | A2.5 |
| CP-09 | System Backup | A2.6A2.10 |
| CP-10 | System Recovery and Reconstitution | A2.9S8 |
IA Identification and Authentication
IR Incident Response
MA Maintenance
MP Media Protection
PE Physical and Environmental Protection
| Control | Name | BOT IT Risk Notification References |
|---|---|---|
| PE-01 | Policy and Procedures | A1.3 |
| PE-02 | Physical Access Authorizations | A2.4 |
| PE-03 | Physical Access Control | A2.4 |
| PE-06 | Monitoring Physical Access | A2.4 |
| PE-09 | Power Equipment and Cabling | A2.4 |
| PE-11 | Emergency Power | A2.4 |
| PE-13 | Fire Protection | A2.4 |
| PE-14 | Environmental Controls | A2.4 |
| PE-15 | Water Damage Protection | A2.4 |
| PE-18 | Location of System Components | A2.4 |
| PE-23 | Facility Location | A2.4 |
PL Planning
PM Program Management
| Control | Name | BOT IT Risk Notification References |
|---|---|---|
| PM-01 | Information Security Program Plan | A1.1A1.2A1.3 |
| PM-02 | Information Security Program Leadership Role | A1.2 |
| PM-04 | Plan of Action and Milestones Process | A4.2A5.2 |
| PM-05 | System Inventory | A2.1 |
| PM-07 | Enterprise Architecture | A1.1 |
| PM-09 | Risk Management Strategy | A1.1A1.2A1.3A3.2S9 |
| PM-13 | Security and Privacy Workforce | A1.4A3.1A4.1A5.1 |
| PM-16 | Threat Awareness Program | A2.6 |
| PM-25 | Minimization of Personally Identifiable Information Used in Testing, Training, and Research | A2.7 |
| PM-28 | Risk Framing | A1.1A3.2S9 |
| PM-29 | Risk Management Program Leadership Roles | A1.1A1.2A3.1 |
| PM-31 | Continuous Monitoring Strategy | A3.2 |
PS Personnel Security
RA Risk Assessment
SA System and Services Acquisition
| Control | Name | BOT IT Risk Notification References |
|---|---|---|
| SA-01 | Policy and Procedures | A1.3 |
| SA-02 | Allocation of Resources | A6.1 |
| SA-03 | System Development Life Cycle | A2.7A6.2A6.3 |
| SA-04 | Acquisition Process | A2.7A2.10 |
| SA-05 | System Documentation | A2.7 |
| SA-08 | Security and Privacy Engineering Principles | A2.7 |
| SA-09 | External System Services | A2.10 |
| SA-10 | Developer Configuration Management | A2.7 |
| SA-11 | Developer Testing and Evaluation | A2.7 |
| SA-16 | Developer-provided Training | A2.7 |
| SA-17 | Developer Security and Privacy Architecture and Design | A2.7 |
| SA-22 | Unsupported System Components | A2.1 |
SC System and Communications Protection
| Control | Name | BOT IT Risk Notification References |
|---|---|---|
| SC-01 | Policy and Procedures | A1.3 |
| SC-05 | Denial-of-service Protection | A2.5S8 |
| SC-07 | Boundary Protection | A2.5 |
| SC-08 | Transmission Confidentiality and Integrity | A2.2A2.5A2.10 |
| SC-12 | Cryptographic Key Establishment and Management | A2.2 |
| SC-13 | Cryptographic Protection | A2.2 |
| SC-28 | Protection of Information at Rest | A2.2A2.10 |
SI System and Information Integrity
| Control | Name | BOT IT Risk Notification References |
|---|---|---|
| SI-01 | Policy and Procedures | A1.3 |
| SI-02 | Flaw Remediation | A2.6 |
| SI-03 | Malicious Code Protection | A2.6 |
| SI-04 | System Monitoring | A2.5A2.6A2.10 |
| SI-05 | Security Alerts, Advisories, and Directives | A2.6A2.10 |
| SI-12 | Information Management and Retention | A2.2 |
| SI-13 | Predictable Failure Prevention | S8 |